Fill out or adjust the 1 to 5 key figures here below.
Your savings will show automatically at the bottom of this page.

 
Number Of Machines machines
Operating hours/year hours/year
Machine cost/hour €/hour
Labor cost/hour €/hour
Current machine availability % %

Downtime: machines x x % = hours

Standstill caused by mechanical or electric faults (= 65% of Downtime): = hours
Standstill caused by hydraulic faults ( = 35% of Downtime): = hours
.. of which caused by the contaminated fluid ( = 80% of hydraulic faults): = hours
Total of the fluid related downtime costs: x =
Total of the labour cost for repair: x =

Total of your maintenance expenditures at this moment:


Perfect fluid service and constantly clean oil will prevent 80% of fluid-related costs.
What remains is just 20% of your actual maintenance cost.

Remaining downtime hours:   -80%   = hours
Reduction in downtime cost:   -80%   =
Reduction in labour cost:   -80%   =

Total remaining with Triple R

 

-80%

 

=


Total of your savings

=